Cutting-edge semiconductor technologies and methodologies driving innovation and excellence.
Comprehensive capabilities across the semiconductor design spectrum.
Full-flow RTL to Tape-out using Synopsys (Fusion Compiler), Cadence (Virtuoso, Innovus), and Mentor (Calibre) tool stacks. Custom PDK libraries for 28nm, 14nm, 7nm, and 5nm nodes.
3D transistor architectures providing 30–50% lower power vs planar CMOS. Sub-threshold voltage scaling for mobile and AI chips.
Wide-bandgap Gallium Nitride devices with 3× higher breakdown voltage and 5× lower on-resistance than legacy silicon.
Proficiency across leading Electronic Design Automation platforms.
RTL design, synthesis, and optimization tools
Simulation, formal, and emulation platforms
P&R, timing closure, and signoff tools
Power, signal integrity, and reliability analysis
Our team has hands-on experience with industry-leading EDA tools from major vendors, enabling us to work seamlessly within your existing design ecosystem or recommend optimal tool configurations for your projects.
Phased rollout scaling from mature nodes to advanced sub-5nm GAA technologies.
| Phase | Process Nodes | Technology Mandate | Target Applications | Timeline |
|---|---|---|---|---|
| Phase I | 65nm / 28nm | Bulk CMOS, Planar FET | MCUs, IoT, Power Mgmt, Defence | Years 1–3 |
| Phase II | 14nm / 10nm | FinFET (Tri-gate) | Networking, EV, Healthcare ICs | Years 4–6 |
| Phase III | 7nm | Advanced FinFET + EUV | AI Edge SoCs, 5G, CCTV Vision | Years 7–9 |
| Phase IV | 5nm & Below | GAA Nanosheet FET | AI Superchips, Space, Quantum | Years 10+ |
Our advanced campus incorporates the world's most sophisticated process machinery.
Extreme Ultraviolet (13.5nm wavelength) for sub-7nm patterning and dual-patterning Deep Ultraviolet (DUV) for 14nm/10nm nodes.
Metal-Organic Chemical Vapor Deposition lines for 200mm wafers, enabling power GaN HEMTs with 10x better merit than silicon.
Gate-All-Around transistor architecture where gate surrounds the channel on all 4 sides, enabling 3nm/5nm scaling.
Angstrom-level precision dielectric and metal film deposition, critical for High-k gate dielectric (HfO₂) layers.
Sub-nanometer surface planarization targeting 0.2nm surface roughness to match world-class foundry yields.
3D chip stacking utilizing Through-Silicon Via (TSV) technology for High Bandwidth Memory (HBM) and chiplet architectures.
The Vayuvyastra campus is a self-sustaining industrial township spanning 4,000 acres, structured to segregate production, utilities, and human capital zones.
| S.N. | Zone Name | Area (Acres) | Share (%) | Key Facilities & Specifications | Phase |
|---|---|---|---|---|---|
| 1 | Semiconductor Fab Core | 950 | 23.8% | 4 advanced Fab buildings, Cleanroom Class 1–10 environments, Metrology tools, Yield management core | Ph I–IV |
| 2 | Healthcare Electronics Unit | 280 | 7.0% | MEMS & Biosensor fab, ISO 13485 compliant cleanrooms, clinical device testing laboratory | Phase I |
| 3 | LED Manufacturing Unit | 210 | 5.3% | MOCVD epitaxy facility, high-speed die bonding, automated smart LED module assembly lines | Phase II |
| 4 | CCTV & Vision Security Unit | 210 | 5.3% | SoC design studio, chip sorting & test, camera module assembly & hardware encryption validation | Phase II |
| 5 | R&D & Innovation Hub | 320 | 8.0% | Licensed EDA computer labs, multi-project wafer (MPW) pilot lines, IP filing centre, university co-labs | Ph I–II |
| 6 | Administration & Operations | 250 | 6.3% | HQ Tower, ERP/IT mainframe infrastructure, HR operations, legal counsel and security command center | Phase I |
| 7 | Employee Township & Housing | 480 | 12.0% | Category A/B/C residential quarters, executive guest houses, community centers, daycares and schools | Phase II |
| 8 | Hospital & Wellness Centre | 150 | 3.8% | 150-bed multi-specialty hospital, outpatient clinics, cleanroom-aligned emergency ambulance hub | Phase I |
| 9 | Canteen & Food Court Zone | 60 | 1.5% | Central industrial canteen (5,000-seat capability), local food streets, executive dining blocks | Phase I |
| 10 | Bank & Commercial Zone | 40 | 1.0% | Domestic bank branches, round-the-clock ATM kiosk lobby, post office, and retail grocery stores | Phase II |
| 11 | Parking & Transport Hub | 200 | 5.0% | Multi-level smart parking, EV fast-charging stations, shuttle bus terminal, logistics docking bays | Phase I |
| 12 | Green Belt & Recreational | 400 | 10.0% | Contiguous forested buffer zones, landscaping parks, outdoor sports complex, indoor meditation hall | Phase II |
| 13 | Utilities Infrastructure Zone | 100 | 2.5% | 400kV main substation, 30,000 KL/day UPW purification plant, central STP/ETP, battery storage yard | Phase I |
| 14 | Expansion & Future Buffer | 350 | 8.8% | Reserved space for Phase V GAA sub-2nm roadmap expansion and upstream chemical supplier units | Post Ph IV |
| - | TOTAL CAMPUS | 4,000 | 100% | Self-sustaining deep-tech micro-city and manufacturing ecosystem | - |
High-precision semiconductor fabs require absolute resource security. Our infrastructure plans guarantee uninterrupted process supplies.
| Facility / Unit | Water Quality | Demand (KL/day) | Source/Treatment |
|---|---|---|---|
| Semiconductor Fab | Ultra-Pure Water | 12,000 | 5-stage RO-EDI-UV-Membrane UPW plant |
| Cooling & HVAC | Treated Industrial | 8,000 | Municipal feed + deep wells |
| Chemical Scrubbers | Process Grade | 2,000 | De-mineralized (DM) water plant |
| Assembly Units (3) | Treated Industrial | 3,500 | On-site effluent recycling plant |
| Township & Amenities | Potable Water | 4,500 | Municipal potable lines + STP reuse |
| PEAK WATER DEMAND | Mixed Grade | 30,000 | ZLD Compliant ETP (Zero Discharge) |
UPW Water standard: Resistivity > 18 MΩ·cm at 25°C is maintained with zero particulate counts above 0.05 microns.
| Facility / Load Core | Load (MVA) | Peak (MW) | Uninterrupted Backup System |
|---|---|---|---|
| Semiconductor Fabs | 450 | 380 | Dual-feed 400kV substation + backup battery |
| Cleanroom HVAC / HEPA | 120 | 95 | Dedicated rotary UPS + dual DG farms |
| Assembly & Test Fabs | 80 | 60 | National Grid connection + DG backup |
| R&D, Admin & IT Server | 40 | 30 | Multi-tier UPS battery bank + Solar Park |
| Township & Amenities | 30 | 22 | Rooftop solar solar-grid feed + DG backup |
| TOTAL CONNECTED LOAD | 720 | ~587 | Dedicated substation + 30MW solar storage |
Green energy mix: 30 MW solar park on campus covers 25% of load by Year 5, scaling to 50% by Year 10.
To operate a high-volume wafer fab, contiguous land configurations and infrastructure are required. Vayuvyastra has earmarked locations that satisfy government PLI logistics requirements:
Proximity to an international airport (< 50 km) is mandatory for raw silicon wafer imports and export shipping logistics.
A ₹1,90,000 Crore megaproject requires meticulous financial forecasting and structured phasing to guarantee return on equity.
| Phase | Timeline | Core Capital Activities | CAPEX (₹ Cr) | Share |
|---|---|---|---|---|
| Phase I | Years 1-3 | 65nm/28nm Fab core, Healthcare MEMS Fab, site preparation, civil works | 45,000 | 23.7% |
| Phase II | Years 4-6 | 14nm/10nm FinFET lines, GaN power lines, LED & CCTV assembly factories | 65,000 | 34.2% |
| Phase III | Years 7-9 | 7nm advanced EUV fab lines, wafer scaling, product IP expansions | 50,000 | 26.3% |
| Phase IV | Years 10-12 | 5nm GAA advanced fab lines, R&D park, global export and commercial township | 30,000 | 15.8% |
| Cost Head Category | Key Sub-category Items | Budget (₹ Cr) | Share |
|---|---|---|---|
| Fab Equipment & Tools | ASML EUV/DUV Lithography, CVD, CMP, Metrology | 72,000 | 37.9% |
| Civil & Infrastructure | Buildings, cleanroom HVAC (Class 1-100), gas yards | 28,500 | 15.0% |
| Downstream Units | Healthcare MEMS, LED assembly, CCTV vision units | 57,000 | 30.0% |
| Land & Site Dev | 4,000 acres, site levelling, roads, drainage utilities | 12,000 | 6.3% |
| R&D & Innovation | EDA Tool Licenses, multi-project wafer pilot lines | 12,000 | 6.3% |
| Working Capital & Ops | Chemicals, process gases, test wafers, initial staff ramp | 8,500 | 4.5% |
| Funding Source Group | Amount (₹ Crores) | Share (%) | Financial Instrument | Strategic Rationale & Milestones |
|---|---|---|---|---|
| Government of India (MeitY) | 57,000 | 30.0% | Capital Subsidy Grant | Bilateral approvals under India's Semiconductor Mission (ISMC Scheme) |
| State Government Partner | 19,000 | 10.0% | Land Equity + Grants | Freehold land transfer + capex PLI rebates and power tariff subsidies |
| Strategic Foreign Investors | 47,500 | 25.0% | Foreign Direct Investment | FDI Equity from US, EU, and Japanese fab equipment & material consortiums |
| Domestic Institutional Investors | 28,500 | 15.0% | Equity + NCDs | Pension fund investments & Non-Convertible Debentures from DFIs |
| Long-term Project Debt | 38,000 | 20.0% | Consortium Term Loan | Bank consortium loan at 7.5% interest, with a 3-year grace moratorium |
| TOTAL FUNDING CAPITAL | 1,90,000 | 100% | Mixed Structure | Earmarked to support all phases from greenfield setup to advanced fabs |
| Year | Revenue | OPEX | CAPEX | EBITDA | Interest | Depreciation | PBT | Tax (25%) | PAT |
|---|---|---|---|---|---|---|---|---|---|
| Year 1 | 0 | 2,000 | 15,000 | (2,000) | 2,850 | 1,500 | (6,350) | — | (6,350) |
| Year 2 | 500 | 3,500 | 18,000 | (3,000) | 4,500 | 3,200 | (10,700) | — | (10,700) |
| Year 3 | 2,500 | 5,000 | 12,000 | (2,500) | 5,100 | 4,800 | (12,400) | — | (12,400) |
| Year 4 | 8,000 | 7,000 | 20,000 | 1,000 | 4,800 | 6,500 | (10,300) | — | (10,300) |
| Year 5 | 18,000 | 9,500 | 22,000 | 8,500 | 4,200 | 8,100 | (3,800) | — | (3,800) |
| Year 6 | 32,000 | 12,000 | 23,000 | 20,000 | 3,800 | 9,500 | 6,700 | 1,675 | 5,025 |
| Year 7 | 55,000 | 15,000 | 18,000 | 40,000 | 3,200 | 10,200 | 26,600 | 6,650 | 19,950 |
| Year 8 | 80,000 | 18,000 | 14,000 | 62,000 | 2,600 | 10,800 | 48,600 | 12,150 | 36,450 |
| Year 9 | 1,05,000 | 20,000 | 10,000 | 85,000 | 2,000 | 11,200 | 71,800 | 17,950 | 53,850 |
| Year 10 | 1,30,000 | 22,000 | 8,000 | 1,08,000 | 1,400 | 11,500 | 95,100 | 23,775 | 71,325 |
| Year 12 | 1,75,000 | 25,000 | 5,000 | 1,50,000 | 800 | 11,500 | 1,37,700 | 34,425 | 1,03,275 |
| Year 15 | 2,35,000 | 28,000 | 2,000 | 2,07,000 | 200 | 10,500 | 1,96,300 | 49,075 | 1,47,225 |
| Repayment Period | Outstanding Debt | Annual Principal Repayment | Interest Payments (7.5%) | Debt-Service Coverage Ratio |
|---|---|---|---|---|
| Years 1–3 (Grace Period) | ₹38,000 Cr | NIL (Moratorium) | ₹2,850 Cr/yr (Capitalized) | N/A |
| Years 4–6 | ₹38,000 Cr → ₹28,000 Cr | ₹3,333 Cr/yr | ₹3,900 Cr → ₹2,100 Cr | 0.9× → 1.8× |
| Years 7–10 | ₹28,000 Cr → ₹5,000 Cr | ₹5,750 Cr/yr | ₹2,100 Cr → ₹375 Cr | 3.2× → 8.5× |
| Years 11+ (Debt FREE) | Fully Repaid | NIL | NIL | Cash Rich |
| Incentive Program / Scheme | Detailed Provisions & Strategic Allocation | Projected Financial Impact |
|---|---|---|
| MeitY ISMC Scheme | 50% of total project cost eligible for capital subsidy grants for greenfield fab. | ₹42,500 Cr (Grant over 6 years) |
| State Government PLI (TS/AP model) | 20% capital expenditure reimbursement on tools, cleanroom build, and land subsidies. | ₹14,400 Cr (Equipment Subsidy) |
| SEZ / IFSC Corporate Income Tax Holiday | 100% corporate tax exemption for the first 10 years of profitable operations. | 0% Corporate Tax (Years 6–10) |
| Industrial Power Tariff Rebate | ₹2 per unit industrial power tariff rebate for high-load cleanroom HVAC operations. | ~₹900 Cr / year (At full scale) |
| MSME / Startup India GST Refund | Full refund on domestic and imported capital equipment procurement and duties. | ₹4,500 Cr (Capital GST Refund) |
| TOTAL CUMULATIVE INCENTIVES | Combined central & state policy incentive package over 10 years. | ~₹62,300 Crores |
Partner with Vayuvyastra Semicon to access cutting-edge semiconductor technology capabilities for your next project.